Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Bell, L C and Stukhart, G (1987) Costs and Benefits of Materials Management Systems. Journal of Construction Engineering and Management, 113(02), 222–34.

Cowie, G F (1987) Enough Scope Yields Better Estimates. Journal of Construction Engineering and Management, 113(02), 315–20.

Halligan, D W, Hester, W T and Thomas, H R (1987) Managing Unforeseen Site Conditions. Journal of Construction Engineering and Management, 113(02), 273–87.

Hendrickson, C, Martinelli, D and Rehak, D (1987) Hierarchical Rule‐Based Activity Duration Estimation. Journal of Construction Engineering and Management, 113(02), 288–301.

Ibbs, C W, Bates, L C and Echeverry, D (1987) Owner‐Furnished Equipment (OFE) Contract Practices. Journal of Construction Engineering and Management, 113(02), 249–63.

Koehn, E and Caplan, S B (1987) Work Improvement Data for Small and Medium Size Contractors. Journal of Construction Engineering and Management, 113(02), 327–39.

Maloney, W F and McFillen, J M (1987) Motivational Impact of Work Crews. Journal of Construction Engineering and Management, 113(02), 208–21.

O'Connor, J T, Rusch, S E and Schulz, M J (1987) Constructability Concepts for Engineering and Procurement. Journal of Construction Engineering and Management, 113(02), 235–48.

Paulson, B C, Chan, W T and Koo, C C (1987) Construction Operations Simulation by Microcomputer. Journal of Construction Engineering and Management, 113(02), 302–14.

Ringwald, R C (1987) Bunching Theory Applied to Minimize Cost. Journal of Construction Engineering and Management, 113(02), 321–6.

Rounds, J L and Warning, G (1987) Impact of Computerizing Midsized Construction Companies. Journal of Construction Engineering and Management, 113(02), 183–90.

Tatum, C B (1987) Balancing Engineering and Management in Construction Education. Journal of Construction Engineering and Management, 113(02), 264–72.

Tatum, C B (1987) Improving Constructibility during Conceptual Planning. Journal of Construction Engineering and Management, 113(02), 191–207.

  • Type: Journal Article
  • Keywords: Constructability; Construction methods; Project management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1987)113:2(191)
  • Abstract:
    The effective integration of design and construction offers important benefits and means to achieve project objectives. The results are given of an investigation of industrial and building projects undertaken to identify the steps progressive owners, designers, and contractors take to improve project constructibility during the early phases of a project. Using information from 15 projects, it describes the major concerns, approaches used, and constructibility improvements related to three key issues: developing the project plan, laying out the site, and selecting major construction methods. These findings then provide a basis for conclusions and practical applications to improve constructibility during the conceptual planning phase of a project, when the leverage is greatest.

Whittaker, J (1987) Equipment Rates from Revenue Requirements. Journal of Construction Engineering and Management, 113(02), 173–8.